CDA identifies Rs 3 billion in recoverable violations along Islamabad Expressway
Action initiated against 377 structures over unauthorized construction and land-use violations, authority says.

According to the Associated Press of Pakistan, the Capital Development Authority (CDA) has identified violations involving around Rupees three billion in recoverable land conversion charges and penalties along the Islamabad Expressway East.
The CDA said action has been initiated against 377 structures, including 281 commercial buildings, over unauthorized construction and violations related to land use, setbacks, and floor area ratio.
Sources
EGazette summarizes reporting from multiple sources; follow the links for the originals.
Related articles

Report: Military aircraft crashes near US air base in Spangdahlem, Germany
A report from Deutsche Welle — English sets out the main available details, with claims kept attributed to their sources.

Report: Red Sox commit to Tracy as long-term manager, keep Breslow through 2030
A report from ESPN sets out the main available details, with claims kept attributed to their sources.

Report: British jets refuel Saudi fighter jets from the air to repel Houthi attacks
The Deutsche Welle — Arabic report presents the highlights of the available material on this development, while keeping the allegations attributable to their sources.

Report: Fantasy basketball: Sleepers, breakouts and busts for 2026-27
A report from ESPN sets out the main available details, with claims kept attributed to their sources.

Report: MMA divisional rankings: No denying Tsarukyan's rise at lightweight
A report from ESPN sets out the main available details, with claims kept attributed to their sources.

Report: Trump Says Before UN General Assembly He Is Considering Option of Either Reaching Deal With Iran or "Pushing It to Hell"
BBC Arabic's report highlights the main points available on this development, while keeping all claims attributed to their sources.
Comments
Loading comments…